2012 cruising the waterways in Almyne

D'fer on the roof of Almyne
Top
Wed 2nd May 2012 canals canals
Marston Junction to Atherstone, 10 miles repeat
Towing Gulliver is much easier than towing Almyne Too was. I think that the draft of Gulliver is much less than Almyne Too so the wash from Almyne does not get dissipated in the same way as it used to.

Fri 4th May 2012
Atherstone to Alvecote, 7 miles 11 locks repeat
Used the facilities at the top lock before going down the flight.
At least they both fit in a 70 ft lock together. With me towing the cruiser, Clive races from one lock to the next in his car and is generally there before me with the lock ready, so all I have to do is go in and let Clive work the lock for me. Not entirely sure that this is a good idea as I am getting very little exercise.
Clive did a wonderful job of working the locks and rushing back to his car to get to the next section before I did. Long day and moored up close to The Samuel Barlow for an evening drink.

Tue 8th May 2012
New water tank arrived, just needs to be painted and installed.
I had already organised with Alex to make me a new water tank and when it was delivered Clive and I set to to fit it, after I had given the inside two coats of potable bitumen.

Wed 9th May 2012 canals canals

Painted tank, inside and out.
The pictures show the before and after on the outside but I couldn't get any pictures of the inside with me in there as there wasn't room.

 

 

 



Thur 10th May 2012 canals canals
canals

Today we cleaned and prepared the area for the new water tank.
With a new bigger better water tank I will be able to re-arrange the cratch so that it is usable.

 

Bench seat either side with a little table at the front, I might even be able to have breakfast in there.

 

 

 

 

 



Tue 15th May 2012 canals canals
Wow it actually fits.

 

Now to make bearers to hold the floor that will sit on top of the tank but not actually press on it.

 

 

 

 

 



Thur 24th May 2012 canals canals
canals canals
canals canals

Almost done, what a mammoth task that was.
Now to cut a sheet of ply for flooring over the new tank and install it on the bearers already fitted.
Had to make sure to leave a 'hatch' that can be removed to get to the tank so that the annual 'blacking' of the inside of the tank can be done. This is to ensure that the water remains drinkable and does not get contaminated with rust, which although will not kill you does look a bit unsightly when making a cup of tea. After all, who wants red tea.

 

 

 

 

 

 




Fri 25th May 2012
The plan now is to head off to the Erewash as I have not done the Erewash before.

Sat 26th May 2012

Sun 27th May 2012
BackNext